RFI for Repair Service on 6V53/6V53T Diesel Engine and Container - NSN: 2815014122715
United StatesDepartment of the ArmyEnergy
United States·Sources Sought11 days left
Published by Department of the Army
Department of the Army has published a sources sought in the United States for: Request for Information - Market Intelligence for WAK030, WAK032, and WAK033. Responses are due by 3 Dec 2026, 23:00 UTC (11 days left).
The U.S. Army Corps of Engineers, Alaska District, seeks market intelligence on industry capability and interest for three Wake Island efforts: replacing finished-water storage (WAK030), repairing utility and backup-power infrastructure (WAK032), and repairing or replacing modular housing (WAK033). The estimated acquisition magnitude is $71,000,000, anticipated via Progressive Design Build under Other Transaction Authority. This is an RFI only; no solicitation is currently available.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm's ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 237110- Water and Sewer Line and Related Structures Construction and 236220 - Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has multiple requirements for: Wake Island Water Tanks(WAK030): Replace aging finished-water storage infrastructure and associated potable-water-system components to provide reliable, resilient finished-water storage and distribution capability for Wake Island operations. Wake Island Infrastructure Repairs (WAK032): Repair and improve critical utility infrastructure to increase the reliability, resiliency, and operability of Wake Island water-supply and backup-power systems. WAK033- Wake Modular Housing (WAK033): Improve available on-island bedspace by repairing through replacement modular housing units that support installation personnel and mission requirements. Will be used as a model/prototype for future similar construction. Estimated Acquisition Magnitude: $71,000,000. Planned Acquisition Strategy: Anticipated to utilize Progressive Design Build via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design Build. Phase 1: Design and Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project's scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR). Phase 2: Final Design and Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods. SUBMISSION INSTRUCTIONS: Please see the following link to the Market Intelligence Questionnaire: https://forms.osi.apps.mil/r/BnKcje1rVx Submit your responses in MS Forms by 03 December 2026 at 14:00 Alaska Time. Any questions regarding the requirements or issues please reach out to Brittney Morrison at Brittney.Morrison@usace.army.mil , Nicole Thomas Nicole.R.Thomas@usace.army.mil, Theresa Afrank at Theresa.M.Afrank@usace.army.mil and Raven Donelson at Raven.S.Donelson@usace.army.mil.
Text from the official notice on SAM.gov Contract Opportunities (US). Long notices are shortened here. Read the complete notice at the source.
The United States federal government is the largest single buyer in the world. Contract opportunities expected to exceed $25,000 are published on SAM.gov as presolicitations, sources sought notices, solicitations and combined synopsis/solicitations.
All tenders in the United StatesGuide: How to bid on US federal contracts through SAM.gov
Keep looking
United StatesDepartment of the ArmyEnergy
United StatesDepartment of the ArmyConstruction
United StatesCity of Boston (Massachusetts)General
United StatesOregon Department of Human Services (Oregon)General
United StatesDepartment of the ArmyGeneral
United StatesFederal Bureau of InvestigationGeneral