Project 629-25-104 ED Suicide Risk Mitigation Fence
United StatesVeterans Affairs, Department ofConstruction
United States·Solicitation16 days left
Published by Veterans Affairs, Department of
Veterans Affairs, Department of has published a solicitation in the United States for: Fire Suppression System Maintenance and. Responses are due by 8 Dec 2026, 15:00 UTC (16 days left).
The Department of Veterans Affairs seeks maintenance of fire suppression systems and kitchen exhaust hood cleaning at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana, and an off-site location at 9045 East 59th Street. The work covers hoods, suppression units, exhaust fans, ducts and a grease trap across multiple buildings.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
Site Visit: A site visit will be held on December 1, 2026, at 9:00 a.m. ET. Interested vendors should meet at building 6 at the Richard L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202. See map and pinned location below for building 6. Following the walkthrough of the main hospital, vendors may attend an additional walkthrough at the off-site location: 9045 East 59th Street, Building 402, Indianapolis, IN 46216. Please note that transportation to the off-site location will not be provided by the VA. RFI Responses Submitted by: Gunnar Sager, COO, FinalLine Solutions L.L.C. INFORMATION NEEDED: 1.Site visit PWS §§ 7, 8, 11 and Appendix A. Can the VA arrange a pre-quote site visit at both the main medical center and Building 402 for FinalLine Solutions and its prospective kitchen exhaust cleaning and fire protection subcontractors? We would like to see the three Canteen hoods (C-1166), the Production Kitchen hood (C-B144) and its upper-floor duct and fan connections, the rooftop exhaust fans, the Building 402 hood, suppression system and grease trap, and the Kidde IND-21 units at Buildings 1 and 22. Please provide available dates and times, the meeting location, and any registration, escort or ID requirements. Yes, a pre-quote site visit can be arranged. 2.Exhaust duct routes and access PWS § 7 and Appendix A.2. PWS § 7 refers to "the eight previously listed main-campus duct systems." Please identify those eight systems. Can the VA also provide any available duct drawings or route sketches, fan and access-panel locations, and known inaccessible sections, particularly for the Production Kitchen and the fourth- and fifth-floor connections? If a site visit cannot be arranged, please provide any photos or prior cleaning reports that show existing access conditions. The eight systems were a reference to language in the previous contract. The PWS has been updated to remove that language, as the VA is uncertain what it was referring to. The PWS has also been updated to include exhaust fan locations. The rest can be determined by a site visit. Previous cleaning reports, including one dated April 2026 is attached, that includes photos in response to this RFI. 3.Building 402 grease trap PWS §§ 8, 11 and Appendix A.3. Please confirm the trap type and capacity (gallons), the cover location, and the approved overnight pump-truck staging location. If known, please provide the approximate hose distance from the staging point to the trap and any vehicle size, weight or access restrictions. Unknown. Can be determined by the offeror during scheduled site visit. 4.Building 402 equipment Appendix A.1 and A.2. Please confirm the make, model and agent type of the Building 402 kitchen suppression system (KS-05) and the exhaust fan ID serving hood KH-05. Unknown. Can be determined by the offeror during a scheduled site visit. 5.Prior service history PWS § 5 and Appendix A.4. PWS § 5 requires the schedule to use verified prior service dates and states that a contract transition does not restart intervals. Please provide the current or most recent contractor's service records, or at minimum the last completion dates, for each suppression unit (monthly, semiannual and annual), each hood cleaning (KH-01 to KH-05) and the GT-01 pump-out. Please also identify any work currently overdue. According to our records it is believed to be as follows: KH-1 to KH-04 Fire Semi-Annual Inspections were completed on 10/20/2026. Cleanings for these systems were completed on 10/26/2026. KH-5 was cleaned in September 2026, the Semi-annual inspection date is unknown and assumed due. GT-01 was cleaned in September 2026. HM-01 to HM-05 Semi-annual inspections were completed on 10/20/2026. 6.Extended-interval testing PWS § 9 and Appendix A.4. Please identify any extended-interval maintenance or testing known to be due during the base or option years, along with the affected system IDs and anticipated due dates. If any of this work must be priced with the quote, please identify the applicable line item. See updated pricing schedule attached. 7.Personnel credentialing VAAR 852.204-70 and 852.204-72; PWS § 11. Will contractor and subcontractor technicians performing recurring monthly and quarterly service need PIV cards or background investigations, or will VA-issued temporary or visitor badges be sufficient? Please identify any processing lead time needed before the first visit. Contractor and subcontractor personnel must satisfy the applicable VA personnel-vetting and credentialing requirements before beginning work. The required investigation level, identification credential, and processing lead time will be confirmed by the CO in coordination with the responsible VA security personnel. A visitor badge shall not be assumed to replace required vetting. 8.Price schedule format Solicitation § B.2; PWS § 2 and Appendix B. Section B.2 requests a single monthly price for each performance year, while PWS § 2 calls for separately identifiable service categories. Will the VA accept the completed B.2 schedule with a separate supporting price breakdown by service category (monthly suppression inspections, semiannual suppression service, hood inspection and cleaning, grease trap service), or is there a required format? See updated pricing schedule attached. 9.Anticipated start date Solicitation § B.2; PWS § 2. Is January 1, 2027 still the anticipated start date for the base period? This is a target start date- the POP for the base will begin upon award. Submitted by: Healing Hands Healing Hearts, LLC INFORMATION NEEDED: 1. PWS Section 7 - Please confirm whether all areas of the kitchen exhaust systems, including the hoods, ductwork, exhaust fans, and rooftop components, are easily accessible for cleaning. If any special access equipment is needed, please advise. Offeror can make this determination during a scheduled site visit. 2. …
Text from the official notice on SAM.gov Contract Opportunities (US). Long notices are shortened here. Read the complete notice at the source.
The United States federal government is the largest single buyer in the world. Contract opportunities expected to exceed $25,000 are published on SAM.gov as presolicitations, sources sought notices, solicitations and combined synopsis/solicitations.
All tenders in the United StatesGuide: How to bid on US federal contracts through SAM.gov
Keep looking
United StatesVeterans Affairs, Department ofConstruction
United StatesVeterans Affairs, Department ofDefence & Security
United StatesCity of Boston (Massachusetts)Facilities
United StatesIndian Health ServiceFacilities
United StatesDefense Logistics AgencyFacilities
United StatesDepartment of the NavyFacilities