Laise

United States·Sources Sought3 days left

Modernize Regenerative Thermal Oxidizer (RTO)

Published by Bureau of Engraving and Printing

At a glance

Bureau of Engraving and Printing has published a sources sought in the United States for: Modernize Regenerative Thermal Oxidizer (RTO). Responses are due by 25 Nov 2026, 21:00 UTC (3 days left).

What this tender is asking for

The Bureau of Engraving and Printing's Western Currency Facility in Fort Worth, Texas, is planning a design/build project to replace its regenerative thermal oxidizer and associated exhaust ventilation system. The new RTO would serve 22 printing presses and include a modern control panel, self-optimizing ventilation, and redundancy with the existing RTO. This is a sources sought notice only, not a solicitation.

Easy to miss

  • This is a sources sought notice, not a request for proposals.
  • Project is design/build and must provide redundancy between the new and existing RTO.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
Bureau of Engraving and Printing
Country
United States, TX - Texas, TX
Notice type
Sources Sought
Reference
2031ZA27B00001
Published
18 Nov 2026
Submission deadline
25 Nov 2026, 21:00 UTC
NAICS code
238220
Department
Treasury, Department of the
Office
Office of the Chief Procurement Officer
Set-aside
None (full and open, unless the notice says otherwise)
Product/service code
Z2AZ

Scope and requirements

SEEKING SOURCES ONLY - The Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF) is located at 9000 Blue Mound Road, Fort Worth, TX, 76131. Construction began on the WCF in 1987 and was completed in 1989. The Modernized Regenerative Thermal Oxidizer (RTO) is an air pollution control device that is required by the NSR (New Source Review) Air Permit issued by the TCEQ (Texas Commission on Environmental Quality) to treat Volatile Organic Compounds (VOC) emissions from Plate Printing presses (14), Offset presses (4), and Rotary Screen presses (4). The existing RTO was commissioned in 2010 to control VOC emissions from Plate Printing. In 2021, the Offset presses were added to the RTO system. The existing conveyance system, which currently includes ducting from each press to the roof, nine (9) roof fans, and a 48" main duct on the roof, has been in place since the facility was built in the early 90s. The system has been cobbled together as presses were added in Plate Printing, which originally only housed four (4) presses, without consideration for the wholistic efficiency of the system. It is a requirement of the Clean Air Act, EPA regulations, and the WCF air permits, that an air pollution control device associated with a "facility" (equipment or area that is emitting air pollutants as defined by EPA) must be maintained in good condition and operated properly while the attached "facilities" operate. This design/build project shall replace the RTO and the associated exhaust ventilation system: a new RTO with a modern control panel including safe PLCs and lower working voltage, a properly designed exhaust ventilation system that self-optimizes with feedback from modern performance-monitoring systems, properly sized roof fans, accessibility to clean ducting where needed, and increased voe capture efficiency to better exhaust printing areas while allowing the RTO to operate using less supplemental fuel. The new system shall also incorporate features to decrease the amount of ink and oils that get conveyed into the exhaust ventilation system causing air flow issues and damaging ducting, fans, and other system components. Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system. In 2025, the existing RTO underwent several upgrades including the installation of a new, modern control panel to address obsolete components and increasingly difficult troubleshooting. This project shall set the Western Currency Facility (WCF) up for success in providing operational redundancy alongside the newly overhauled RTO that is currently operating at the facility. The entire voe exhaust ventilation system shall feed into one of two RTOs (existing or new) with the capability to divert process flow from one RTO to the other in the event one RTO shuts down for any reason. This redundancy shall enable production to continue operating while the root cause of the issue is addressed.

Text from the official notice on SAM.gov Contract Opportunities (US). Long notices are shortened here. Read the complete notice at the source.

How to respond on SAM.gov

  1. 1Open the official notice on SAM.gov and download every attachment, including amendments.
  2. 2Confirm your SAM.gov registration is active and that your NAICS code and size status fit any set-aside.
  3. 3Send questions in writing to the contracting contact before the question cut-off in the solicitation.
  4. 4Submit your offer by the method in the solicitation (often email or an agency portal) before the response deadline.

Official contact

Organisation
Office of the Chief Procurement Officer
Phone
2024862465

Tendering in the United States

The United States federal government is the largest single buyer in the world. Contract opportunities expected to exceed $25,000 are published on SAM.gov as presolicitations, sources sought notices, solicitations and combined synopsis/solicitations.

  • Sources sought notices are market research, not bids. Responding to them is one of the best ways to shape a later solicitation and get noticed by the contracting officer.
  • Foreign firms can register in SAM.gov, but check each solicitation for domestic preference rules such as the Buy American Act and trade agreement coverage.
  • Questions must usually go in writing to the contracting officer named on the notice, before the stated question deadline.

All tenders in the United StatesGuide: How to bid on US federal contracts through SAM.gov

Keep looking

Similar open tenders