Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Published by Energy, Department of

At a glance

Energy, Department of has published a solicitation in the United States for: Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB. Responses are due by 17 Dec 2026, 22:00 UTC (25 days left).

What this tender is asking for

Fermilab seeks a general contractor to build an addition and renovate the Central Utility Building, which supplies chilled water, hot water, low conductivity water and makeup water to lab buildings. Work must fit within an accelerator shutdown expected from January 2028 to January 2030, with defined milestones through September 2029.

Who can bid

  • No set-aside is used; the notice does not otherwise restrict who may bid.

How to respond

  • Proposals are due December 17, 2026, per Amendment No. 3.
  • Questions are due December 1, 2026, per Amendment No. 3.
  • Amendment No. 4 replaced Exhibits G, L and M with revised versions.

Easy to miss

  • Additional site visit dates were added in Amendment No. 4; earlier amendments set site visit dates.
  • The contractor must start on-site work and finish within the accelerator shutdown window, with milestones from NTP to September 2029.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
Energy, Department of
Country
United States, Batavia, IL
Notice type
Solicitation
Reference
RFP-376508-CD
Published
19 Nov 2026
Submission deadline
17 Dec 2026, 22:00 UTC
NAICS code
236210
Office
Fermilab - DOE Contractor
Set-aside
No Set aside used
Product/service code
Z2EZ

Scope and requirements

On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates. On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab's mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab's accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 - Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 - 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 - 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 - 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 - 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Text from the official notice on SAM.gov Contract Opportunities (US). Long notices are shortened here. Read the complete notice at the source.

How to respond on SAM.gov

  1. 1Open the official notice on SAM.gov and download every attachment, including amendments.
  2. 2Confirm your SAM.gov registration is active and that your NAICS code and size status fit any set-aside.
  3. 3Send questions in writing to the contracting contact before the question cut-off in the solicitation.
  4. 4Submit your offer by the method in the solicitation (often email or an agency portal) before the response deadline.

Official contact

Organisation
Fermilab - DOE Contractor
Phone
6308404256

Tendering in the United States

The United States federal government is the largest single buyer in the world. Contract opportunities expected to exceed $25,000 are published on SAM.gov as presolicitations, sources sought notices, solicitations and combined synopsis/solicitations.

  • Sources sought notices are market research, not bids. Responding to them is one of the best ways to shape a later solicitation and get noticed by the contracting officer.
  • Foreign firms can register in SAM.gov, but check each solicitation for domestic preference rules such as the Buy American Act and trade agreement coverage.
  • Questions must usually go in writing to the contracting officer named on the notice, before the stated question deadline.