Ukraine·Invitation for Bids11 days left

Procurement of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydrop …

Published by PRIVATE JOINT STOCK COMPANY "UKRHYDROENERGO"

At a glance

PRIVATE JOINT STOCK COMPANY "UKRHYDROENERGO" has published an invitation for bids in Ukraine for: Procurement of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydrop …. Responses are due by 3 Dec 2026, 16:00 UTC (11 days left). The contract is financed by the World Bank under the Improving Power System Resilience for European Power Grid Integration Project.

What this tender is asking for

PJSC Ukrhydroenergo invites bids to design, supply and install battery energy storage systems with energy management systems and ancillary equipment, plus staff training, at four hydropower plants in Ukraine. The work is split into four lots: Kyiv HPP/PSP (46 MW), Kaniv (66 MW), Kremenchuk (60 MW) and Seredniodniprovska (25 MW). It is financed by World Bank and CTF loans and grants.

Who can bid

  • Bidders may bid for one, several or all four lots.
  • General experience since at least January 2020 in design, supply and installation for energy infrastructure, including BESS and MV/HV grids.
  • Audited balance sheets or acceptable financial statements for the last five fiscal years.
  • Minimum average annual turnover over three fiscal years: Lot 1 USD 36m, Lot 2 USD 51m, Lot 3 USD 46m, Lot 4 USD 20m.

How to respond

  • Two-envelope bidding process; bids submitted under RFB reference No. UHE-IPSR-DSI-1.
  • Bids offering a Time for Completion exceeding 510 days shall be rejected.

How offers are judged

  • Rated criteria apply under the two-envelope process.
  • No credit will be given for early completion.

Easy to miss

  • Time for Completion must be between 420 and 510 calendar days from the Contract Effective Date.
  • Bidders for multiple lots must meet cumulative turnover and combined cash-flow requirements.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
PRIVATE JOINT STOCK COMPANY "UKRHYDROENERGO"
Country
Ukraine
Notice type
Invitation for Bids
Procedure
Request for Bids
Reference
UHE-IPSR-DSI - 1
Published
13 Nov 2026
Submission deadline
3 Dec 2026, 16:00 UTC
Financed by
World Bank
Project
Improving Power System Resilience for European Power Grid Integration Project
Project ID
P176114
Procurement group
Civil works

Scope and requirements

SPECIFIC PROCUREMENT NOTICE

Request for Bids

Plant

Design, Supply, and Installation (Without Prequalification)

(Two-Envelope Bidding Process with rated criteria)

Country : Ukraine

Project : Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo)

Contract Title : Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydropower Plants, including related services (training of UHE staff) (hereinafter referred to 'the Contract') comprising the following lots:

Lot 1: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, including related services (training of UHE staff) (46 MW BESS capacity).

Lot 2: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kaniv HPP, including related services (training of UHE staff) (66 MW BESS capacity).

Lot 3: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kremenchuk HPP, including related services (training of UHE staff) (60 MW BESS capacity).

Lot 4: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Seredniodniprovska HPP, including related services (training of UHE staff) (25 MW BESS capacity).

Source of financing:

IBRD Loan No.: 9284-UA;

CTF Loan No.: TF0B5994;

CTF Loan No.: TF0C5903-UA; and

CTF Grant No.: TF-0B5724.

Project ID : P176114

RFB reference No .: UHE-IPSR-DSI-1

1. Private Joint Stock Company "Ukrhydroenergo" (PJSC "Ukrhydroenergo" or UHE) has received financing from the World Bank (hereinafter referred to as the "Bank") toward the cost of the Project "Ukraine - Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo)" and intends to apply part of the proceeds toward payments under the Contract. Under this Contract, UHE intends to make payments using the Direct Payment disbursement method, as defined in the World Bank Disbursement Guidelines for Investment Project Financing.

2. PJSC "Ukrhydroenergo" now invites eligible Bidders to submit Bids for the Contract. Bidders can bid for any one lot, more than one lot or all the four lots . The Time for Completion shall be between 420 and 510 calendar days from the Effective Date of the Contract. No credit will be given for early completion, and Bids offering a Time for Completion exceeding 510 days shall be rejected.

3. Prospective Bidders shall meet the following minimum qualification requirements:

(a) General Experience: Experience in activities related to the design, supply and installation of equipment for energy infrastructure facilities, including generating facilities, battery energy storage systems (BESS), and MV and HV grids, under contracts in the role of contractor, subcontractor, or management contractor since at least January 2020. Design and construction experience may be from different contracts.

(b) Financial Capabilities : The Bidder shall submit audited balance sheets or, if not required by the law of the Bidder's country, other financial statements acceptable to UHE for the last five (5) fiscal years to demonstrate the current soundness of the Bidder's financial position and its prospective long-term profitability.

(c) Average Annual Turnover:

The Bidder shall demonstrate a minimum average annual turnover for the last three (3) fiscal years as follows:

Lot 1 - USD 36 million;

Lot 2 - USD 51 million;

Lot 3 - USD 46 million;

Lot 4 - USD 20 million.

Bidders submitting Bids for multiple Lots shall meet the cumulative average annual turnover requirements applicable to those Lots.

The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments, to meet the following minimum cash-flow requirements:

Lot 1 - USD 9 million;

Lot 2 - USD 13 million;

Lot 3 - USD 12 million;

Lot 4 - USD 5 million.

Bidders submitting Bids for multiple Lots shall meet the combined financial resources requirements applicable to those Lots.

(d) Specific Experience:

(i) The Bidder shall demonstrate participation as contractor, joint venture member, subcontractor, or management contractor in at least two (2) contracts since 01.01.2020, each of which has been successfully and fully completed and has a minimum power and energy capacity of at least:

Lot 1 - 35 MW / 35 MWh;

Lot 2 - 50 MW / 50 MWh;

Lot 3 - 48 MW / 48 MWh;

Lot 4 - 20 MW / 20 MWh.

Completion shall be based on obtaining of the Operational Acceptance Certificate, Commissioning Certificate, Taking Over Certificate, Commercial Operation Certificate, Facility Readiness Certificate, or equivalent documents demonstrating successful completion.

The similarity of the contracts shall be based on experience in the design, supply and installation of Battery Energy Storage Systems, either as a stand-alone facility or as part of a larger power project, including but not limited to a hybrid renewable energy project.

The referenced contracts shall demonstrate experience covering design, supply and installation of the relevant facility under the Bidder's overall contractual responsibility.

A Bidder submitting Bids for more than one Lot shall meet the specific experience requirement for the largest individual Lot for which it is bidding. The experience related to design could have been met even through a specialized subcontractor. …

Text from the official notice on World Bank Projects & Operations. Long notices are shortened here. Read the complete notice at the source.

How to respond to a World Bank financed notice

  1. 1Check the notice type. A request for expressions of interest asks for your qualifications only; an invitation for bids or request for proposals asks for a full offer.
  2. 2Contact the implementing agency listed below to obtain the bidding documents or terms of reference.
  3. 3Prepare your submission in the format required by the World Bank Procurement Regulations for the stated method.
  4. 4Deliver it to the implementing agency, not to the World Bank, before the deadline in the notice.

Official contact

Organisation
PRIVATE JOINT STOCK COMPANY "UKRHYDROENERGO"
Phone
+38 (04596) 5 82 71
Address
07300, town Vyshgorod, Kyiv oblast, Ukraine, Ukraine

Tendering in Ukraine

Most notices listed here for Ukraine are financed by international development institutions such as the World Bank. They are run by the government agency implementing the project, under the funder's procurement rules, and are open to eligible international bidders.

  • For development-bank projects, firms from any eligible country can bid, and a local partner or joint venture often strengthens the offer.
  • Send clarification questions early and in writing to the contact named in the notice.