Travaux de rehabilitation de 06 mares pastorales
SenegalUNDP SenegalConstruction
Senegal·Request for quotation1 day left
Published by UNDP Senegal
UNDP Senegal has published a request for quotation in Senegal for: BMS/ITM/SIS REQ0187691- Senegal- Public Electric Vehicle Charging Hub- Site #2. Responses are due by 23 Nov 2026, 23:59 UTC (1 day left). The contract is financed by the United Nations.
UNDP Senegal, with SENELEC and SENTER, is building a public electric vehicle charging hub as a showcase smart energy project. The turnkey scope covers four DC fast chargers of at least 100 kW each and two dual-port AC chargers on one pedestal, plus installation, testing, commissioning and SENELEC network integration.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
The UNDP Senegal Country Office, in collaboration with the UNDP ITM Green Energy Team , the Société Nationale d'Électricité du Sénégal (SENELEC) and the Société Nationale de Gestion du Patrimoine du Train Ex pre ss Régional (SENTER) , has initiated the development of a public electric vehicle charging hub .
The project will contribute to the UN Sustainable Development Goals and serve as a demonstrative smart energy solution with potential for local replication.
Project Objectives
The objective of this project is to deliver a reliable, cost-effective, and intelligent charging hub with integrated smart facility features. As the installation is intended to serve as a national and international showcase, UNDP ITM requires high standards of quality, performance, safety, and aesthetics. This document defines the site-specific information, minimum technical requirements, and installation standards for the project.
The bidder shall submit a com pre hensive proposal for a turnkey electric vehicle charging hub based on the following scope of work:
Supply and delivery of the charging equipment under the selected configuration: Four (4) DC fast chargers with a minimum 100 kW per charging station; Two (2) dual- port AC charg ers comprising one (1) Type 2 AC charger with a minimum rated power of 22 kW and one (1) GB/T AC charger with a minimum rated power of 7 kW ; both installed on the same pedestal .
Installation, User Acceptance Test (UAT) , and Commissioning of the complete solution Integration of the complete solution into the SENELEC network . Provision of bi-annual pre ventive maintenance visits and after - sales service by the local par tner for 1 year , resulting in a total of two ( 2 ) visits . Training of the SENELEC operators and SENTER/SETER team on system operation and maintenance to ensure knowledge transfer continuity after the first year of after-sales services provision .
Text from the official notice on UNDP Procurement Notices (United Nations). Long notices are shortened here. Read the complete notice at the source.
Public sector opportunities in Senegal, gathered from official procurement publications.
All tenders in SenegalGuide: How to find international tenders
Keep looking
SenegalUNDP SenegalConstruction
SenegalUNDP SenegalIT & Telecoms
United StatesDepartment of the ArmyEnergy
NorwayStatsbyggEnergy
AlbaniaCentral Purchasing Operator (OBP)Energy€1,121,156
AlbaniaCentral Purchasing Operator (OBP)Energy€353,304