Rehabilitation and modernization of irrigation schemes - lot 1: doma (nasarawa state) and galala (bauchi state); lot 2: kampe omi (kogi state) and dukku lade (kwara state); lot 3: …

Published by Sustainable Power and Irrigation for Nigeria (SPIN) Project Federal Ministry of Water Resources & Sanitation,

At a glance

Sustainable Power and Irrigation for Nigeria (SPIN) Project Federal Ministry of Water Resources & Sanitation, has published an invitation for prequalification in Nigeria for: Rehabilitation and modernization of irrigation schemes - lot 1: doma (nasarawa state) and galala (bauchi state); lot 2: kampe omi (kogi state) and dukku lade (kwara state); lot 3: …. Responses are due by 22 Dec 2026, 12:00 UTC (30 days left). The contract is financed by the World Bank under the Sustainable Power and Irrigation for Nigeria Project.

What this tender is asking for

The Federal Ministry of Water Resources & Sanitation, under the World Bank-financed SPIN Project, seeks design-and-build contractors to rehabilitate and modernise irrigation schemes across six Nigerian states in three lots. Works include intakes, lined canals, hydraulic and drainage structures and access roads, with 18 months implementation plus a 12-month defects period per lot.

Who can bid

  • Open to all eligible applicants under the World Bank Procurement Regulations for IPF Borrowers, September 2025.
  • Joint ventures are limited to three members.
  • Financial resources required: Lot 1 US$4 million; Lot 2 US$6.5 million; Lot 3 US$4 million.
  • Minimum average annual construction turnover 2021-2025: Lot 1 US$26 million; Lot 2 US$39 million; Lot 3 US$26 million.

How to respond

  • Interested applicants may obtain further information from the SPIN Federal Project Management Unit by e-mail at info@spinproject.ng.
  • A complete set of the Initial Selection Document in English is available.
  • Specific experience must be supported by mandatory documentary evidence.

How offers are judged

  • Initial selection follows the World Bank Procurement Regulations for IPF Borrowers, September 2025.
  • Applicants must show general experience as prime contractor or JV member for at least the last five years from 1 January 2021.
  • Specific experience: two similar irrigation contracts completed between 1 January 2021 and the application deadline, each of minimum value Lot 1 US$16 million; Lot 2 US$24 million; Lot 3 US$16 million.
  • Design experience: two irrigation design contracts of at least 1,800 hectares each, one showing technical design optimisation.

Easy to miss

  • Requirements for applicants bidding multiple lots are aggregated.
  • Request for Proposals expected to be issued to initially selected applicants by February 2027.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
Sustainable Power and Irrigation for Nigeria (SPIN) Project Federal Ministry of Water Resources & Sanitation,
Country
Nigeria
Notice type
Invitation for Prequalification
Procedure
Request for Proposals
Reference
FMWR&S/SPIN/D&B/RFP/2026/31
Published
10 Nov 2026
Submission deadline
22 Dec 2026, 12:00 UTC
Financed by
World Bank
Project
Sustainable Power and Irrigation for Nigeria Project
Project ID
P179684
Procurement group
Civil works

Scope and requirements

Invitation for Initial Selection

Works

(Design and Build)

Employer: Federal Ministry of Water Resources & Sanitation

Project: Sustainable Power and Irrigation for Nigeria (SPIN) Project

Contract title: Rehabilitation and Modernization of Irrigation Schemes:

Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State);

Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and

Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State).

Country: Nigeria

Credit No.: 76370NG

ISD No: FMWR&S/SPIN/D&B/RFP/2026/31

Issued on: November 10, 2026

1. The Federal Government of Nigeria has received financing from the World Bank toward the cost of the Sustainable Power and Irrigation for Nigeria (SPIN) Project and intends to apply part of the proceeds toward payments under the contracts for Rehabilitation and Modernization of Irrigation Schemes:

Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State);

Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and

Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State).

2. The Federal Ministry of Water Resources & Sanitation, through the Federal Project Management Unit (FPMU) of the SPIN Project, intends to initially select Applicants for the Procurement of works (Design and Build), summarized below:

a) Scope: Design review/upgrade (surveys, investigations and a modernised final design, including provision for Farmer-Led Irrigation Development) and rehabilitation/construction of intakes, lined canals, hydraulic and drainage structures and access roads, etc through to commissioning and handover. Modernisation includes replacing unlined channels with lined canals or piped/pressurized networks where feasible, improved water control and measurement structures, and innovations that improve scheme performance. Full details of the scope of works are provided in the Initial Selection Document (ISD).

(b) Performance: The works shall achieve high overall irrigation efficiency from source to field. This includes conveyance efficiency above 90% for lined canals, field application efficiency above 80% for surface irrigation, and distribution uniformity of at least 65%. The works shall also deliver an adequate, reliable and equitable water supply that meets crop water requirements throughout the irrigation season, to head, middle and tail-end users alike. Implementation within 18 months (two dry seasons) per Lot, plus a 12-month Defects Notification Period, under FIDIC Plant and Design-Build 2017, reprinted 2022 with amendments.

c) Key Qualification Requirements:

(i) Financial resources (liquid assets, lines of credit, etc.): Lot 1: US$4 million; Lot 2: US$6.5 million; Lot 3: US$4 million.

(ii) Minimum average annual construction turnover (2021-2025): Lot 1: US$26 million; Lot 2: US$39 million; Lot 3: US$26 million.

(iii) General experience: experience under construction contracts in the role of prime contractor or JV member for at least the last five (5) years, starting 1st January 2021.

(iv) Specific experience: two (2) similar contracts for construction or rehabilitation of irrigation works, satisfactorily and substantially completed between 1st January 2021 and the application deadline, each of minimum value Lot 1: US$16 million; Lot 2: US$24 million; Lot 3: US$16 million; with experience in irrigation works of at least 1,800 hectares, canal networks and water control structures, supported by mandatory documentary evidence.

(v) Design experience: two (2) contracts for the design of irrigation systems, each with a minimum area of 1,800 hectares, at least one of which demonstrates technical design optimisation addressing scheme-specific hydraulic, geotechnical and structural conditions. This may be met by the Applicant and/or a specialised subcontractor.

Requirements for multiple Lots are aggregated. Joint Ventures are limited to three members. Full qualification criteria are in the ISD.

3. It is expected that the Request for Proposals will be issued to initially selected Applicants by February 2027.

4. Initially selected Applicants may submit Proposals for one or several contracts (Lots), as further defined in the Request for Proposals document.

5. Initial Selection will be conducted through the procedures as specified in the World Bank's Procurement Regulations for IPF Borrowers, September 2025 ("Procurement Regulations"), and is open to all eligible Applicants as defined in the Procurement Regulations.

6. Interested eligible Applicants may obtain further information from the Federal Project Management Unit of the Sustainable Power and Irrigation for Nigeria (SPIN) Project (e-mail: info@spinproject.ng) at the address given below, between 09:00 am and 15:00 pm (Nigerian time), Monday to Friday.

7. A complete set of the Initial Selection Document in English may be purchased by interested Applicants on the submission of a written application to the address below and upon payment of a non-refundable fee of NGN 300,000.00 (Three Hundred Thousand Naira) only, or USD 225.00 (Two Hundred and Twenty-Five United States Dollars) only. The method of payment will be:

(a) Naira: through REMITA (www.remita.net) to the CBN (TSA) Account No. 0020293665077, Federal Ministry of Water Resources and Sanitation: Sustainable Power and Irrigation for Nigeria, under the service type "Sale of Bid Document"; or

(b) United States Dollars: by bank transfer to the following account:

Beneficiary Bank: Central Bank of Nigeria (CBN)

Beneficiary Bank Address: Plot 33, Tafawa Balewa Way, CBD, Abuja, Nigeria

Beneficiary Bank SWIFT Code: CBNINGLA

Account Name: Federal Ministry of Water Resources and Sanitation: Sustainable Power and Irrigation for Nigeria (SPIN) USD Project Account

Account Number: 3000151883 …

Text from the official notice on World Bank Projects & Operations. Long notices are shortened here. Read the complete notice at the source.

How to respond to a World Bank financed notice

  1. 1Check the notice type. A request for expressions of interest asks for your qualifications only; an invitation for bids or request for proposals asks for a full offer.
  2. 2Contact the implementing agency listed below to obtain the bidding documents or terms of reference.
  3. 3Prepare your submission in the format required by the World Bank Procurement Regulations for the stated method.
  4. 4Deliver it to the implementing agency, not to the World Bank, before the deadline in the notice.

Official contact

Organisation
Sustainable Power and Irrigation for Nigeria (SPIN) Project Federal Ministry of Water Resources & Sanitation,
Phone
08034432501
Address
Plot 1402 Abba Kyari Street, Off Adesoji Aderemi Street, Apo 1st Floor / Room No. 08 Abuja-FCT, 90, Nigeria

Tendering in Nigeria

Federal procurement in Nigeria is regulated by the Bureau of Public Procurement under the Public Procurement Act 2007. Many of the larger opportunities open to international bidders are financed by development partners such as the World Bank and are listed here from those sources.

  • Federal opportunities are also advertised in the Federal Tenders Journal and national newspapers.
  • State governments run their own procurement agencies with separate registration requirements.
  • Oil and gas is a separate system. Upstream operators such as NNPC units, Shell, TotalEnergies, Chevron and Seplat tender through NipeX, the Nigerian Petroleum Exchange, and only invite suppliers registered and categorised in its qualification system (NJQS). Those tenders are listed here from NipeX.

All tenders in NigeriaGuide: How government tenders work in Nigeria