Independent Technical QA Consultant - Architect
KosovoMinistry of HealthConsulting
International and multi-country·Invitation for Bids36 days left
Published by Ministry of Health
Ministry of Health has published an invitation for bids across multiple countries for: Procurement of It infrastructure for strengthening DHIS 2 Implementation and data ware house. Responses are due by 29 Dec 2026, 02:00 UTC (36 days left). The contract is financed by the World Bank under the Health Emergency Preparedness, Response and Resilience Program Using the Multiphase Programmatic App.
Ethiopia's Federal Ministry of Health is buying IT infrastructure to strengthen DHIS 2 implementation and a data warehouse, funded by a World Bank-financed health emergency preparedness project. The scope covers design, supply, installation, testing, commissioning, technical support and training, including large storage, compute, SDN, power and cooling equipment.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
Specific Procurement Notice - Request for Proposals without Prequalification
Request for Proposal
Information Systems
(Design, Supply and Installation)
(Without Prequalification)
Purchaser : Federal Ministry of Health
Project : AFE Health Emergency Preparedness, Response, And Resilience MPA Project
Contract title : Procurement of IT infrastructure for strengthening DHIS 2 Implementation and data warehouse
Country : Ethiopia
Loan No. /Credit No. / Grant No.: E229-ET
RFP No: ET-MOH-480615-GO-RFB
Issued on: November 16, 2026
The Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Ethiopia Health Emergency Preparedness, Response & resilience program MPA , and intends to apply part of the proceeds toward payments under the contract for Procurement of IT infrastructure for strengthening DHIS 2 Implementation g(Supply, installation, Testing, commissioning of information system, including technical support & Training service)
The Federal Ministry of Health, Ethiopia now invites sealed Proposals from eligible Proposers for the Procurement of ITS infrastructure for strengthening DHIS 2 Implementation and data warehouse.
S/N
Items (Category)
Description (measurable)
Unit
Quantity
Note / Remark (Acceptance criteria & measurables)
GENERAL REQUIREMENTS
1
General technical requirements
English UI/docs; UTF-8 support; operate on Ethiopian power (220-240V single / 380-415V three-phase, 50Hz); firmware/software latest stable at install
set
1
Acceptance: Verify UTF-8 display, sample English strings; power compatibility test; firmware/software version list; docs in English. Warranty: 3 yrs on-site. MAF if bidder ≠ OEM.
2
Environmental & Safety
Operate at 18-27°C, 40-60% RH non-condensing; ISO 14644-1 Class 8 air quality; noise ≤70 dBA aggregated
set
1
Acceptance: Environmental log (48-hr) within range; noise reading in aisle ≤70 dBA. EMC certificates (CE/FCC/EN) required.
STORAGE - SCALE-OUT / BACKUP
3
NVMe SAN (performance tier)
Usable NVMe SAN capacity 150 TiB , SAN protocol, RDMA capable
TiB
150
Acceptance: Usable capacity verified; SAN connectivity test; RDMA handshake test; performance baseline (IOPS/latency) as vendor data.
4
Distributed NVMe NAS / Object / HDFS
Usable NVMe NAS/object capacity 400 TiB , support NFS/CIFS/HDFS/S3
TiB
400
Acceptance: Multi-protocol read/write tests; object multipart & versioning tests; throughput baseline.
5
HDD Tiering (capacity layer)
Usable HDD capacity 1.0 PiB , tiering with SSD cache
PiB
1
Acceptance: Tier migration test; capacity & performance after tiering; SSD cache hit ratio report.
6
Centralized backup ()
Physical capacity 200 TiB , active-active controllers, RAID-6 or equivalent
TiB
200
Acceptance: Backup speed ≥72 TB/hr system; restore ≤36 TB/hr; dedupe ratio evidence; RAID resilience test (tolerate 3 disk failure in RAID group where specified). Gartner leader vendor evidence required.
STORAGE NODE HARDWARE (minima)
7
All-flash NVMe SAN node (per node minima)
≥512 GB RAM; ≥96 CPU cores (48×2); 2×480 GB system disks; NVMe disks ~7.68 TB; 2×25GbE + 2×GE mgmt
node
as proposed
Acceptance: BOM check; boot & perf test; NIC throughput test.
8
All-flash NVMe NAS node (per node minima)
≥512 GB RAM; ≥96 cores; usable capacity guidance per vendor; 4×25GbE
node
as proposed
Acceptance: Multi-protocol access & concurrency tests.
9
HDD Tiering node (per node minima)
≥256 GB RAM (or spec), SSD cache 4×3.2 TB, ≥96 cores
node
as proposed
Acceptance: Cache eviction & rebuild tests.
COMPUTE / VIRTUALIZATION
10
Compute servers
Virtualization Computing Resource Pool: Rack servers: 2×x86 CPUs
CPU Cores
616
11
Compute servers
Virtualization Computing Resource Pool: Rack servers: 2×x86 CPUs
RAM
GB
5376
SDN / DATA-WAREHOUSE FABRIC
15
SDN Controller cluster
1-node cluster; manage ≥1.8K NVEs per 1-node cluster; OpenFlow/NETCONF southbound; REST northbound; intent orchestration, dry-run & rollback
unit
1
Acceptance: Controller cluster failover test; scale test report (1.8K NVEs); API call set; dry-run configuration and rollback validated. Third-party test reports required. MAF required.
POWER, COOLING & DISTRIBUTION
16
Aisle containment (cold containment)
Dual-row cold aisle module 7200×3600×2410 mm; double revolving doors; max IT load 235 kW
module
1
Acceptance: Physical dimensions check; containment pressure test; IT load capacity verification.
17
Server cabinets / racks
42U racks 600×1200×2000 mm; ≥75% perforation; rPDU mount; load ≥1500 kg/m²
unit
20
Acceptance: Rack assembly check; PDU mounting & earth continuity test.
18
In-row cooling units
Air in-row units, 46 kW each, horizontal flow, dual power
unit
4
Acceptance: Cooling capacity test at design load; redundancy & failover test; condensate & piping inspection. MAF required.
19
Power room AC
60 kW sensible cooling, downflow, RS485/Modbus/SNMP
unit
1
Acceptance: Power room temp/humidity control test; communications integration test. MAF required.
20
UPS systems
200 kVA (extendable to 300 kVA), 30-minute runtime at full load, hot-swappable bypass, SNMP/Modbus monitoring
unit
4
Acceptance: Runtime test at 100% load for 30 min; bypass maintenance test; battery health report. MAF required.
21
Main Distribution Board (MDB)
Prefab panel, 1000A busbars, digital metering, TCP/IP or RS485 comms
unit
2
Acceptance: Single-line drawings; functional metering test; protection/relays verification.
22
Power Distribution Frame (PDF) & PDB
PDF: 400A MCCB input, modular outputs; PDB wall-mounted 250A
PDF / PDB
PDF 2 / PDB 2
Acceptance: Overcurrent protection & SPD test; wiring inspection.
DCIM & OPERATIONS
23
DCIM system
Monitoring server (64GB RAM, SSDs), PoE switches, temp/humidity/smoke/water sensors, SMS alarm, 2×2 NOC displays, 8 workstations, browser/server software
set
1 …
Text from the official notice on World Bank Projects & Operations. Long notices are shortened here. Read the complete notice at the source.
Most notices listed here for International and multi-country are financed by international development institutions such as the World Bank. They are run by the government agency implementing the project, under the funder's procurement rules, and are open to eligible international bidders.
All tenders across multiple countriesGuide: World Bank procurement explained for bidders
Keep looking
KosovoMinistry of HealthConsulting
KosovoMinistry of HealthHealthcare
International and multi-countryState Institution "Agriculture Entrepreneurship Development" Project Management UnitHealthcare
International and multi-countryUnidade de Gestao de Projectos EspeciaisHealthcare
International and multi-countryState Institution "Agriculture Entrepreneurship Development" Project Management UnitHealthcare
International and multi-countryState Institution "Agriculture Entrepreneurship Development" Project Management UnitHealthcare