Laise

Ireland·Contract notice12 days left

Procurement of a High-Precision Optical Ground Station (OGS) Telescope Unit for Uplink and Satellite Tracking

Published by Mbryonics Ltd

At a glance

Mbryonics Ltd has published a contract notice in Ireland for: Procurement of a High-Precision Optical Ground Station (OGS) Telescope Unit for Uplink and Satellite Tracking. Responses are due by 4 Dec 2026, 23:59 UTC (12 days left). The estimated value is €420,000, roughly $460,964.

What this tender is asking for

Mbryonics Ltd is buying a turnkey high-precision Optical Ground Station telescope unit for uplink and satellite tracking, covering mount, optics and control software. It is part of Phase 2 of Ireland's QCI project (TransEuroOGS), co-funded by the EU Connecting Europe Facility and the Irish Department of Culture, Communications, and Sport. Delivery must be completed within 3 to 4 months of contract signature.

Easy to miss

  • Delivery window is tight: 3 to 4 months maximum from contract signature.
  • Full CAD models and opto-mechanical layout files are mandatory upon contract award.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
Mbryonics Ltd
Country
Ireland, Galway
Notice type
Contract notice
Procedure
Open procedure
Reference
768707-2026
Published
4 Nov 2026
Submission deadline
4 Dec 2026, 23:59 UTC
Estimated value
€420,000 (approx. $460,964)
CPV code
38630000
Contract nature
supplies

Scope and requirements

The Contracting Authority is seeking tenders for the procurement of a High-Precision Optical Ground Station (OGS) Telescope Unit for Uplink and Satellite Tracking. This procurement is being undertaken as part of Phase 2 of Ireland's QCI project (TransEuroOGS), co-funded by the European Commission Connecting Europe Facility (CEF) and the Irish Department of Culture, Communications, and Sport. The successful tenderer will be required to design, manufacture, and deliver a turnkey telescope unit encompassing the mount, optics, and control software, complying with strict technical and spatial constraints. Key Technical Requirements: Optical Configuration: Ritchey-Chretien (RC) optical design, f/10 to f/12 system, with a clear aperture of at least 700 mm. Low central obstruction is required (30 percent or lower diameter linear obstruction preferred, maximum allowable 34 percent or lower). Optical Coatings and Power Handling: Broad-spectrum reflectivity covering both visible wavelengths and the 1550 nm C-Band NIR telecommunication spectrum, biased for optimal performance at 1550 nm. Reflectance at 1550 nm must be at least 95 percent (protected gold or equivalent high-efficiency NIR coating acceptable). The secondary mirror (M2) and main aperture must handle a high-power launch beam of maximum 40W continuous wave at 1550 nm across the aperture or annulus (power density less than 3300 W per square metre on the primary mirror). Focusing Path and Clear Aperture: Must feature at least one Nasmyth focus port (more preferred). The Nasmyth focus path must be completely free of refracting optical elements (100 percent reflective optics only, with removable optics as an allowable deviation). Clear aperture path through the Nasmyth axis must be at least 60 mm diameter to support downstream Adaptive Optics relay systems. Mount and Dynamic Tracking Specifications: Alt-Azimuth Direct-Drive or equivalent performance mount with low-latency tracking dynamics supporting Low Earth Orbit (LEO) satellite tracking, including high-elevation passes over Zenith. Minimum Azimuth Slew Rate must be at least 5 degrees per second (faster preferred). Pointing and tracking accuracy must be less than 8 to 10 arcsec RMS during dynamic LEO passes. Fastest tracking rate must exceed 1 degree per second with fine range control below this speed. Envelope and Enclosure Compatibility: Total vertical height must not exceed 3000 mm from the base to ensure dome clearance. Maximum radial swing clearance envelope must be at most 1470 mm. The axis of elevation pivot height must ensure clearance at all pointing directions, with the pivot axis positioned no more than 155 mm below the centre of the clearance envelope (or at the centre or higher). Full CAD models and opto-mechanical layout files are mandatory upon contract award. Software, Control Interface and API: Native integration with standard open-source astronomical communication protocols (INDI / INDIGO) or ASCOM / ALPACA frameworks. Open, fully documented network API adaptable to HTTP/REST or WebSocket interfaces for automated robotic control, telemetry, and scriptable trajectory loading. Ethernet data interface and DC power supply preferred. Delivery Constraint: Unit delivery must be completed within 3 to 4 months maximum from contract signature. Please refer to the detailed Technical Specification document for full technical specifications, compliance matrices, and contractual terms.

Text from the official notice on TED (Tenders Electronic Daily, EU). Long notices are shortened here. Read the complete notice at the source.

How to respond to a TED notice

  1. 1Open the official notice on TED to find the buyer's procurement platform and document link.
  2. 2Register on that platform and download the procurement documents.
  3. 3Complete the European Single Procurement Document (ESPD) if required.
  4. 4Submit electronically through the buyer's platform before the deadline for receipt of tenders.

Official contact

Organisation
Mbryonics Ltd

Tendering in Ireland

Irish public bodies advertise on the national eTenders platform, and contracts above EU thresholds are also published on Tenders Electronic Daily (TED), which is where the notices listed here come from.

  • Clarification questions must be raised through the platform before the clarification deadline, and answers are shared with all bidders.

All tenders in IrelandGuide: How to find international tenders

Keep looking

Similar open tenders