Design and Build of a Railway and Related Infrastructure Connecting to the Anaklia Deep-Sea Port

Published by JSC Georgian Railway

At a glance

JSC Georgian Railway has published an invitation for bids in Georgia for: Design and Build of a Railway and Related Infrastructure Connecting to the Anaklia Deep-Sea Port. Responses are due by 15 Jan 2027, 16:00 UTC (54 days left). The contract is financed by the World Bank under the Anaklia Regional Gateway and Overland Connectivity Project.

What this tender is asking for

JSC Georgian Railway invites sealed proposals for design and build of a railway and related infrastructure connecting to the Anaklia Deep-Sea Port in Georgia, under the World Bank-financed Anaklia Regional Gateway and Overland Connectivity Project. The line is about 17.7km, with 30 months for completion and an 18-month Defects Notification Period, under a Yellow Book contract.

Who can bid

  • Open to all eligible Proposers as defined in the World Bank Procurement Regulations for IPF Borrowers, September 2025, Seventh Edition.
  • Must have access to liquid assets, lines of credit or other financial means of at least USD 20,000,000 for construction cash flow, net of other commitments.
  • Minimum average annual construction turnover of USD 125,000,000 over the last 5 years (2021-2025).
  • Similar railway contract experience since 1 January 2017: one contract of at least USD 320,000,000, or two of at least USD 160,000,000 each, plus a detailed railway design contract.

How to respond

  • Submit sealed Proposals in response to RFP No. GE-GR-581481-CW-RFP, issued 13 November 2026.
  • Proposals must be submitted by the deadline stated in the RFP document.

How offers are judged

  • Proposals evaluated per the process in the RFP document, using Rated Criteria (technical and non-price factors) weighted 50% and Proposal cost weighted 50%.

Easy to miss

  • Key activity experience thresholds apply: traction substation at least 35kV, track on concrete sleepers 24km, electrification and contact network 33km, and SCB systems.
  • At least one Environmental and Social Management Plan implemented on a large-scale infrastructure project is required.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
JSC Georgian Railway
Country
Georgia
Notice type
Invitation for Bids
Procedure
Request for Proposals
Reference
GE-GR-581481-CW-RFP
Published
12 Nov 2026
Submission deadline
15 Jan 2027, 16:00 UTC
Financed by
World Bank
Project
Anaklia Regional Gateway and Overland Connectivity Project
Project ID
P519916
Procurement group
Civil works

Scope and requirements

Specific Procurement Notice

Request for Proposals

Works

(Design and Build)

(Single-Stage Request for Proposals, without Initial Selection)

Employer: JSC Georgian Railway (GR)

Project: Anaklia Regional Gateway and Overland Connectivity Project (P519916)

Contract title: Design and Build of a Railway and Related Infrastructure Connecting to the Anaklia Deep-Sea Port

Country: Georgia

RFP No: GE-GR-581481-CW-RFP

Issued on: November 13, 2026

• The Government of Georgia intends to apply for financing from the World Bank toward the cost of the Anaklia Regional Gateway and Overland Connectivity Project, and intends to apply part of the proceeds toward payments under the contract for "Design and Build of a Railway and Related Infrastructure Connecting to the Anaklia Deep-Sea Port."

• The JSC Georgian Railway (GR) now invites sealed Proposals from eligible Proposers for "Design and Build of a Railway and Related Infrastructure Connecting to the Anaklia Deep-Sea Port." The Contract will be implemented in accordance with the "Conditions of Contract for Plant & Design-Build for Electrical & Mechanical Plant & for Building & Engineering Works Designed by the Contractor ("Yellow book") Second edition 2017, reprinted 2022 with amendments". The scope of works includes, inter alia, design and construction of embankment, construction/reconstruction of railway stations and related facilities, railway track, superstructure and overhead contact line in the stations, construction of railway track and overhead catenary system on the main line. The total length of the line is approximately 17.7km. The Time for Completion of the Design and Build is 30 (thirty) calendar months from the Commencement Date, followed by a Defects Notification Period of 18 (eighteen) calendar months.

• Procurement will be conducted through international competitive procurement using Request for Proposals (RFP) as specified in the World Bank's Procurement Regulations for IPF Borrowers for Goods, Works, Non-Consulting and Consulting Services, dated September 2025, Seventh Edition ("Procurement Regulations"), and is open to all eligible Proposers as defined in the Procurement Regulations.

• Proposals will be evaluated in accordance with the evaluation process set out in the RFP document. The following weightings shall apply for Rated Criteria (including technical and non-price factors): 50% and for Proposal cost: 50%.

• Proposers shall meet the following minimum qualification criteria to qualify for award of the Contract:

a) The Proposer shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements estimated as USD 20,000,000 [Twenty Million US Dollars] for the subject contract(s) net of the Proposer's other commitments.

b) Minimum average annual construction turnover of USD 125,000,000 [One Hundred Twenty-Five Million US Dollars], calculated as total certified payments received for contracts in progress and/or completed within the last 5 [2021, 2022, 2023, 2024, 2025] years, divided by 5 [five] years.

c) A minimum number of similar contracts (construction of railway embankment and track, with electrification works/power supply) specified below that have been satisfactorily and substantially completed as a prime contractor, joint venture member, management contractor or Subcontractor between 1st January 2017 and proposal submission deadline:

(i) 1 contract , with a minimum value of USD 320,000,000 (Three Hundred and Twenty Million) equivalent;

Or

(ii) 2 contracts , each of minimum value of USD 160,000,000 (One Hundred and Sixty Million) equivalent.

(iii) At least 1 contract consisting preparation of detailed design for a railway construction (including construction of railway embankment and track, with electrification works/power supply).

d) For the above and any other contracts [substantially completed and under implementation] as prime contractor, joint venture member, or Subcontractor between 1st January 2017 and proposal submission deadline, a minimum construction experience in the following key activities successfully completed in any 24-month consecutive period:

• Arrangement of traction substation - at least 35kV;

• Railway laying works on reinforced concrete sleepers - 24km;

• Electrification works and arrangement of contact network - 33km;

• Arrangement of signalling, interlocking and blocking system (SCB).

e) For the above and any other contracts [substantially completed and under implementation] as prime contractor, joint venture member, or Subcontractor between 1st January 2017 and proposal submission deadline, experience in managing ES risks and impacts in the following aspects: implementation of at least 1 Environmental and Social Management Plan under large-scale infrastructure construction project.

6. The eligible Proposers may obtain further information from JSC Georgian Railway, Attn: Ms. Teona Miminoshvili, at anaklia.project@railway.ge , and inspect the RFP Document during office hours [i.e. 10:00 to 18:00] at the address given below.

7. The RFP Document in English may be acquired by eligible Proposers free of charge upon the submission of a written application to anaklia.project@railway.ge . The document will be sent by e-mail.

8. A single-stage, two-envelope RFP process will be used, and the Proposal will consist of (i) the Technical Part, without any reference to prices ; and (ii) the Financial Part, as detailed in the RFP Document. The Technical and Financial Parts of the Proposals shall be submitted simultaneously in two separate sealed envelopes.

9. The Proposal, both the Technical Part and the Financial Part, must be delivered to the address below on or before January 15, 2027 16:00 (local time) . Electronic Procurement will not be permitted. Late Proposals will be rejected. …

Text from the official notice on World Bank Projects & Operations. Long notices are shortened here. Read the complete notice at the source.

How to respond to a World Bank financed notice

  1. 1Check the notice type. A request for expressions of interest asks for your qualifications only; an invitation for bids or request for proposals asks for a full offer.
  2. 2Contact the implementing agency listed below to obtain the bidding documents or terms of reference.
  3. 3Prepare your submission in the format required by the World Bank Procurement Regulations for the stated method.
  4. 4Deliver it to the implementing agency, not to the World Bank, before the deadline in the notice.

Official contact

Organisation
JSC Georgian Railway
Phone
+995 32 219 90 09
Address
15 Tamar Mepe Ave., 0102 Tbilisi, Georgia, Georgia

Tendering in Georgia

Most notices listed here for Georgia are financed by international development institutions such as the World Bank. They are run by the government agency implementing the project, under the funder's procurement rules, and are open to eligible international bidders.

  • For development-bank projects, firms from any eligible country can bid, and a local partner or joint venture often strengthens the offer.
  • Send clarification questions early and in writing to the contact named in the notice.