Contractor Services Framework Agreement
United KingdomCaledonian Maritime Assets Ltd (Utility)Construction£900M
United Kingdom·Contract opportunity3 days left
Published by Sizewell C Limited
Sizewell C Limited has published a contract opportunity in the United Kingdom for: SZC CWA - Pool Bunker Construction. Responses are due by 25 Nov 2026, 14:30 UTC (3 days left). The estimated value is £20M, roughly $26M.
Sizewell C Limited is seeking a contractor to design and build a weathertight, commissioned Pool Bunker above an existing base slab, supporting assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The scope covers primary steel frame, cladding, a five-section retractable roof, building services, hoists, platforms and installation of three free-issued gantry cranes. Estimated site construction is 40 weeks for the preferred rainscreen solution or 46 weeks for the precast fallback, with target handover by 28 February 2028.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.
The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover.
The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme.
The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review.
The timescales are as follows:
The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution.
The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.
Text from the official notice on Contracts Finder (UK). Long notices are shortened here. Read the complete notice at the source.
UK public bodies publish higher-value contract opportunities on Find a Tender, the government's central digital platform. Notices cover central government, the NHS, local councils, police, universities and utilities.
All tenders in the United KingdomGuide: UK and EU public tenders explained
Keep looking
United KingdomCaledonian Maritime Assets Ltd (Utility)Construction£900M
United KingdomCaledonian Maritime Assets Ltd (Utility)Construction£900M
United KingdomCaledonian Maritime Assets Ltd (Utility)Construction£900M
United KingdomHull City CouncilConstruction
KenyaNyandarua County GovernmentConstruction
United StatesDefense Logistics AgencyConstruction