SZC CWA - Pool Bunker Construction

Published by Sizewell C Limited

At a glance

Sizewell C Limited has published a contract opportunity in the United Kingdom for: SZC CWA - Pool Bunker Construction. Responses are due by 25 Nov 2026, 14:30 UTC (3 days left). The estimated value is £20M, roughly $26M.

What this tender is asking for

Sizewell C Limited is seeking a contractor to design and build a weathertight, commissioned Pool Bunker above an existing base slab, supporting assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The scope covers primary steel frame, cladding, a five-section retractable roof, building services, hoists, platforms and installation of three free-issued gantry cranes. Estimated site construction is 40 weeks for the preferred rainscreen solution or 46 weeks for the precast fallback, with target handover by 28 February 2028.

Who can bid

  • Suitable for small businesses, as stated in the notice.
  • No other eligibility, registration or licence requirements are stated in the notice.

Easy to miss

  • Target handover is 28 February 2028, but the programme depends on base slab completion and K10 area availability and will be revalidated once the K10 release date is confirmed.
  • The base slab and the separate non-destructive testing contract are outside this sourcing strategy; interfaces will be defined in the tender documents.

This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.

Key details

Buyer
Sizewell C Limited
Country
United Kingdom, London
Notice type
Contract opportunity
Reference
C4N123459812
Published
19 Nov 2026
Submission deadline
25 Nov 2026, 14:30 UTC
Estimated value
£20M (approx. $26M)
CPV code
45210000 Building construction work
Contract type
goods
Suitable for small businesses
Yes
Contract start
2027-05-06
Contract end
2028-10-31

Scope and requirements

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.

The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover.

The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme.

The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review.

The timescales are as follows:

The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution.

The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.

Text from the official notice on Contracts Finder (UK). Long notices are shortened here. Read the complete notice at the source.

Tender documents

How to respond on Contracts Finder

  1. 1Open the official notice using the link below. It shows how to apply, which is often through the buyer's own e-tendering portal.
  2. 2Download the attached documents and check the closing time, which is UK time.
  3. 3Register on the buyer's portal if one is named, then submit your response there before the deadline.
  4. 4Lower-value contracts usually need only a short quotation or proposal, so the turnaround can be quick.

Official contact

Organisation
Sizewell C Limited

Tendering in the United Kingdom

UK public bodies publish higher-value contract opportunities on Find a Tender, the government's central digital platform. Notices cover central government, the NHS, local councils, police, universities and utilities.

  • Award criteria and their weightings are published. Structure your response to the criteria, in the same order, using the buyer's own wording.
  • Social value is commonly scored in central government tenders, so prepare specific, measurable commitments.
  • Many contracts are split into lots so smaller firms can bid for part of the work.

All tenders in the United KingdomGuide: UK and EU public tenders explained

Keep looking

Similar open tenders