Cost Code 273.3 - General Carpentry Work | Vertical Extension of Gymnasiums TBS5, Weinfelden
SwitzerlandSekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)Construction
Switzerland·Contract notice7 days left
Published by Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH) has published a contract notice in Switzerland for: BKP 281.5 Artificial Stone and Tile Flooring | Extension of the TBS5 Gymnasium Building, Weinfelden. Responses are due by 29 Nov 2026, 22:59 UTC (7 days left).
The notice covers artificial stone and tile flooring works for the extension of the TBS5 gymnasium building in Weinfelden, Switzerland. The scope includes artificial stone flooring with stair treads and landings, plus wall tiles in sanitary facilities, including all preparatory and finishing work. The extension adds two floors with 12 classrooms, 7 group rooms, staff rooms and an atrium, built in timber element construction.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
Description of Contract: Execution of all artificial stone and tiling works as part of the extension of the TBS5 gymnasium building in Weinfelden. The scope of works includes the supply and professional installation of artificial stone flooring, including stair treads and landings, as well as the supply and installation of wall tiles in the sanitary facilities. The works include all necessary preparatory work, substrate preparation and installation work, as well as all required cutting, fitting and finishing work. This includes, in particular, the formation of edges, connections, transitions and joints, together with all ancillary works necessary to ensure complete and professional execution. All works shall be carried out in accordance with the tender documents, drawings, technical requirements, and applicable standards and regulations. Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension
Text from the official notice on TED (Tenders Electronic Daily, EU). Long notices are shortened here. Read the complete notice at the source.
Public sector opportunities in Switzerland, gathered from official procurement publications.
All tenders in SwitzerlandGuide: How to find international tenders
Keep looking
SwitzerlandSekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)Construction
SwitzerlandSekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)Construction
KenyaNyandarua County GovernmentConstruction
United StatesDefense Logistics AgencyConstruction
IrelandClare County CouncilConstruction€5,500,000
MaltaXaghra Local CouncilConstruction€90,000