Hiring of International Financial Management Specialist
SyriaMinistry of AgricultureFinance
Azerbaijan·Request for Expression of InterestClosed
Published by Ministry of Agriculture
Ministry of Agriculture has published a request for expression of interest in Azerbaijan for: Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes. The submission deadline passed on 16 Nov 2026. The contract is financed by the World Bank under the GFPP to Support Preparation of Competitive, Resilient Agriculture and Irrigation Services (CRAIS) in.
Azerbaijan's Ministry of Agriculture seeks consulting firms to review and update feasibility studies, technical assessments and detailed engineering design for irrigation schemes under the CRAIS project, funded by Loan/Grant TF0D1739. Work runs in three phases: reviewing existing documentation and ranking scheme readiness, updating feasibility studies for all viable sub-projects, then detailed design for one priority sub-project. This addendum provides clarification responses to questions on the terms of reference.
This summary was written by AI from the official notice text. It can miss or misread details. The official notice is the authority.
ADDENDUM No 1
TO THE REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES - FIRMS SELECTION)
The Republic of Azerbaijan
Project Preparation in relation to: Competitive and Resilient Agriculture and Irrigation Services (CRAIS) Project
Loan/Grant No.: TF0D1739
Assignment Title: Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes
Reference No.: CRAIS-P515925-CS-CQS/1
CLARIFICATION RESPONSES REGARDING THE TERMS OF REFERENCE
The following clarifications are provided to ensure a common understanding among all prospective consultants of the scope of the assignment.
As set out in the Terms of Reference (TOR), the assignment is structured in three phases:
• Phase 1 covers review of existing studies, feasibility studies, technical-economic assessments, conceptual designs, hydraulic data, operational records, and intensive technical consultations with ASWRA, irrigation institutions, local stakeholders, and relevant government entities regarding rehabilitation and modernization priorities for the irrigation schemes under Component 1 validating the viability and readiness of the irrigation schemes for World Bank financing, and identifying the needs and scope for updating existing documentation.
• Phase 2 covers the preparation or updating of the necessary technical and economic assessments and feasibility studies for all viable sub-projects identified under Phase 1. The selected priority sub-project will be addressed as a priority to inform the subsequent detailed design work. The feasibility-level work for the remaining viable schemes should provide the necessary inputs for CRAIS project appraisal.
• Phase 3 is limited to the selected priority sub-project and covers the detailed engineering design and preparation or updating of the technical documentation required to bring that sub-project to full procurement and implementation readiness.
Accordingly, the clarifications below should be read together with the TOR and do not amend the scope of the assignment.
No.
Question / Issue Raised
Clarification
1.1
Is it intended to assess the existing technical documentation for all four projects against the requirements of the World Bank and identify any gaps?
Yes. Under Phase 1, the Consultant is required to review the existing feasibility studies, technical-economic assessments, conceptual designs, expert review reports, hydraulic analyses, preliminary technical studies, as-built drawings and operational records for the irrigation schemes under Component 1. Based on this review and consultations, the Consultant shall prepare a readiness assessment for each scheme covering, among other matters, data completeness, technical adequacy of the existing studies, key gaps, the estimated effort required for updating, and a preliminary ranking of readiness for financing. The purpose is to validate the viability and readiness of the proposed schemes for World Bank financing and identify the needs and scope for further work.
1.2
Will the analysis for the other three non-priority projects be conducted only at the feasibility study level, or will corrections and updates also be made to their existing project documentation?
Please refer to Section 3. Scope of Work of the disclosed TOR. Under Phase 2, the Consultant is required to prepare or update the necessary technical and economic assessments and feasibility studies for all viable sub-projects identified under Phase 1 to inform the CRAIS project appraisal. Section 3.2 of the disclosed TOR clearly states that Phase 2 is not limited to the selected priority/readiest scheme; all FSs for the viable schemes need to be updated as much as possible, as needed to complete the project appraisal. The level and extent of such updates should be consistent with the requirements of the TOR, including the essential inputs needed for project appraisal. Upon completion of works under Phase 2, the Consultants are required to deliver an Updated Feasibility Study Report for all viable sub-projects, including preferred options, preliminary technical solutions, indicative quantities and costs, economic/financial analyses, climate-resilience and SCADA recommendations, dam-safety findings, and indicative implementation schedules.
1.3
Which technical, economic, environmental and social criteria are expected to be taken as a basis when selecting the priority canal?
Please refer to Section 3. Scope of Work of the disclosed TOR. In accordance with the TOR, the recommendation of the priority/readiest sub-project shall be based on technical completeness of existing documentation, data availability, economic justification, climate-resilience benefits, dam-safety considerations, implementation readiness, and overall contribution to the objectives of Component 1 . The Consultant's Phase 1 review and readiness assessment should provide the basis for this recommendation.
2.1
What is the technical and functional connection between the works envisaged for the Yengija Reservoir and the objectives and irrigation systems of the CRAIS Project?
The reference to Yengija in the TOR should be understood in the context of the Project Dam Dependency Note , which has a project-wide scope and covers all three CRAIS components. The TOR requires the Consultant to review dam dependency for dams on which the Project relies for water resources or whose failure could affect Project facilities. Yengija, which is under construction, is specifically mentioned as an example to be considered in relation to the Water Users Association/irrigation pilot under Component 2 in the Gabala district. Its inclusion in this context does not imply a technical or hydrological connection with the Component 1 irrigation schemes supplied through the Araz River and Bahramtapa Hydrojunction.
2.2
Which technical or project documents justify the inclusion of the works on the Yengija Reservoir within the scope of this consultancy service? …
Text from the official notice on World Bank Projects & Operations. Long notices are shortened here. Read the complete notice at the source.
Most notices listed here for Azerbaijan are financed by international development institutions such as the World Bank. They are run by the government agency implementing the project, under the funder's procurement rules, and are open to eligible international bidders.
All tenders in AzerbaijanGuide: World Bank procurement explained for bidders
Keep looking
SyriaMinistry of AgricultureFinance
SyriaMinistry of AgricultureConsulting
New ZealandMinistry of Foreign Affairs and TradeWater & Environment
IrelandDonegal County Council_1193Water & Environment€40,000
NorwaySirkula IKSWater & EnvironmentNOK 12M
KenyaKitui County GovernmentWater & Environment