A large share of bids are never properly evaluated. They fail a compliance check in the first hour and are set aside, however good the offer inside. Almost all of those failures are avoidable. These are the mistakes procurement officers see again and again.
Mistakes that disqualify a bid
- Late submission. A bid one minute late is normally rejected, whatever the cause.
- A missing mandatory document, such as a tax clearance certificate, registration or declaration.
- An expired certificate. Documents must be valid on the day of bid opening.
- Unsigned forms, or forms signed by someone without written authority to sign.
- Bid security that is missing, too small, too short in validity or not in the required wording.
- Bid validity shorter than the tender requires.
- Changing the buyer's forms, pricing schedule or contract terms, or adding conditions of your own.
- Submitting by the wrong method: email when a portal was required, or one envelope when two were required.
Mistakes that lose marks
- Not answering the question asked, or missing one part of a multi-part question.
- Claims without evidence: no named projects, values, dates or references.
- Staff CVs that do not show the experience the criteria ask for.
- Prices that do not match the technical proposal, or arithmetic errors in the pricing schedule.
A final check before you submit
- Compare your bid against the document checklist in the tender, item by item.
- Check every date: certificate expiry, bid validity, security validity.
- Confirm the legal name of your company is identical on every document.
- Open every file you are uploading and confirm it is the right, complete version.
- Read all addenda and confirm your bid reflects them.
- Submit with a day in hand and keep the submission receipt.
If you are rejected
Ask why, in writing. Most public buyers must give reasons. If the rejection was wrong, complaint and review procedures exist and have short time limits. If it was right, add the lesson to your checklist so it does not happen twice.